Find out all the latest information and FAQ's here about Nantwich Leisure Centre's Redevelopment
What’s New at Nantwich Leisure Centre?
On 15th January, Everybody Sport and Recreation opened the doors to the brand new extended Gym and new-look reception area complete with a brand new Taste for Life café.
The name of the newly redeveloped centre is ‘Nantwich Leisure Centre’ which we are sure you will agree, better reflects the improved facilities at the site and what it now has to offer to Everybody members and customers.
Works are still ongoing with plans to open an indoor group cycling studio on the first floor soon. A second phase to the project will include the changing provision and access to the Outdoor Pool, to enhance the customer experience for members and tourists alike.
Visit our social media page for updates on the project.
Read the full article
How will I enter and exit the building?
A temporary entrance / exit will move to a new reception area in the group fitness studio from Thursday 18th November – 4th January which can be accessed by the fire door to the front of the building. Check out the graphic above which outlines the new temporary entrance and exit of the facility.
From 4th January you will be able to enter the building through the new front entrance into the new reception area.
What provisions have been made for the security of bikes?
The bike rack will be moved and positioned beside the relocated temporary entrance.
Will the building work impact my swimming and/or swimming lessons?
All swimming lessons and general indoor swimming sessions will carry on as normal. However, part of the project is the expansion of the Green Zone Changing Rooms into the old outdoor changing rooms, which may disrupt our swimmers when using the changing rooms. This impact will be very limited.
Will the building work impact my gym or class session?
To finish the final project works and to get your new leisure centre ready for reopening in the New Year, the Group Fitness Studio closure will be closed from Tuesday 16th November and the Gym will be closed from Thursday 18th November. We plan to reopen on 15th January 2022.
We want to make sure you can continue your health and fitness journey with us, so we will be opening the Barony Sports Complex for use of the Gym from 6am (Mon-Fri) and 9am (Sat-Sun) as well as introducing group fitness classes with your favourite instructors at the Barony, Shavington Leisure Centre and at the Nantwich Civic Hall.
Booking is still essential for group exercise classes and can be made via the online booking portal.
Update: The ground floor group fitness studio will reopen as of 10th January 2022. The gym, cycle studio and café will remain closed until 15th January.
Where do I park to access the Civic Hall?
If you are visiting the Civic Hall for any of your group fitness activities we recommend parking at the Leisure Centre and we can reimburse your parking ticket at Nantwich Leisure Centre reception as normal.
Are there any parking charges at Barony Sports Complex or Shavington Leisure Centre?
Parking at both Barony and Shavington is free of charge.
Will there be locker provision at the alternative locations?
Both Barony and Shavington have locker provision. There is no locker provision at Nantwich Civic Hall.
What are the addresses of the alternative locations?
Shavington Leisure Centre, Rope Lane, CW2 5DJ (approx. 4 miles from Nantwich Leisure Centre, 12 min drive)
Barony Sports Complex, Barony Road, CW5 5QY (approx. 0.5 miles from Nantwich Leisure Centre, 10 min walk or 2 min drive)
Nantwich Civic Hall, Market St, CW5 5DG (approx. 0.3 miles from Nantwich Leisure Centre, 6 min walk – we recommend parking at Snow Hill Car Park and we will reimburse your parking fee)
Where can I find timetable information?
All group fitness class information can be found at the following links:
https://everybody.org.uk/timetables/
Shavington: https://everybody.org.uk/locations/shavington/
Barony: https://everybody.org.uk/locations/barony/
Nantwich Civic Hall: https://everybody.org.uk/locations/nantwich/
How long will the building work take?
The project at Nantwich Pool should take 32 weeks for completion. It is planned that the work will be completed by 15th January 2022.
When will the centre be reopening?
We are looking to reopen the gym, Café and new indoor cycling studio at Nantwich Leisure Centre on Saturday 15th January 2022.
The ground floor group exercise studio with reopen on 10th January 2022.
I want to discuss my membership for the closure period, who can I contact?
For all membership enquiries please contact us on [email protected] or speak to member of the team when visiting Nantwich Leisure Centre.
If you cannot find the answer to your queries please contact us on: [email protected] and we will try our best to respond to your queries as soon as possible.